Relocating your office is a major milestone—but for your IT and technology, it’s also a major risk.

If the move isn’t planned carefully from an IT perspective, you can face:

  • Costly downtime (staff unable to work, phones not ringing, emails not sending)
  • Data loss or corruption
  • Security gaps and compliance issues
  • Frustrated staff and unhappy customers

The good news: with structured planning and a clear checklist, SMEs can move offices with minimal disruption and even use the opportunity to modernize their IT.

This guide walks you through a practical, phased approach to managing the IT side of your office move—designed for SME owners, operations managers, and IT managers (both technical and non-technical).


Why IT Planning Is Critical in Office Moves

For most SMEs, technology underpins almost every business process:

  • Internet and Wi‑Fi for communication and cloud apps
  • Servers and storage for files, databases, and line-of-business systems
  • VoIP phones for sales and customer support
  • Laptops and desktops for day-to-day work
  • Business-critical SaaS tools like CRM, email, and file-sharing

When you move office, all of this has to keep working—or at least be disrupted for as short a time as possible.

Risks of poor IT planning include:

  • Downtime: Staff can’t access systems, take calls, or send emails. Even a few hours of unplanned downtime can translate into significant lost revenue.
  • Data loss: Moving servers or storage without proper backups and shutdown procedures can corrupt data.
  • Security gaps: Misconfigured firewalls or Wi‑Fi, missing patches, or unsecured equipment can expose your business to cyber threats.
  • Productivity loss: Slow networks, patchy Wi‑Fi, and broken printers drag down productivity long after the move.

The aim of this checklist is to reduce these risks, minimize downtime, and ensure your technology move is as seamless as possible.


Phase 1: Assessment & Planning (8–12 Weeks Before the Move)

1. Audit Your Current IT Assets

Start by understanding exactly what you have today. This will drive your design, procurement, and move plan.

Include:

  • Hardware:
    • Workstations, laptops, monitors, docking stations
    • Servers (on-premise and any network-attached storage)
    • Network devices: routers, switches, firewalls, wireless access points
    • Phones/VoIP handsets and headsets
    • Printers and multifunction devices (MFPs)
    • UPS (Uninterruptible Power Supplies) and racks
  • Software and licenses:
    • Server OS and key applications
    • Business applications (CRM, ERP, finance, HR, line-of-business tools)
    • Productivity suites (e.g., Microsoft 365, Google Workspace)
    • Security tools: antivirus/Endpoint Detection and Response (EDR), email security, backup agents, VPN clients
  • Connectivity and circuits:
    • Internet connections (ISP, bandwidth, contract terms, end dates)
    • Phone services (SIP trunks, VoIP provider, numbers, contracts)
    • MPLS/VPN or site-to-site connections, if used

Capture serial numbers, locations, and support contracts. This inventory will also help you update your asset list post-move and assist with ongoing IT management and support.

2. Assess New Office IT Requirements

Visit the new office with IT (or your external IT provider) as early as possible.

Check:

  • Power and electrical:
    • Are there enough power outlets at each workstation area?
    • Is there dedicated power (and ideally separate circuits) for server/network rooms?
    • Is there adequate capacity for future growth?
  • Cabling and data points:
    • How many network ports (RJ45 sockets) are in the office, and where are they?
    • Do they all run back to a central comms/server room?
    • Are they tested and labeled?
  • Server/comms room:
    • Is there a secure, lockable room or cabinet for network gear and any on‑premise servers?
    • Cooling and ventilation: can the room remain within operating temperature?
    • Space for racks, patch panels, UPS units, and future expansion.
  • Internet availability and options:
    • What internet services are available at the new address (fibre, business broadband, leased line)?
    • What are the speeds, SLAs, and lead times for installation?
    • Are there options for secondary/backup connections (e.g., 4G/5G failover)?
  • Wi‑Fi design considerations:
    • Office layout: open plan, meeting rooms, enclosed offices.
    • Areas that must have strong coverage (meeting rooms, hot-desking areas, warehouses).
    • Potential interference sources (thick walls, metal structures).

3. Identify Business and IT Dependencies

Not all systems are equally critical. Identify:

  • Business-critical applications and services:
    • CRM and sales systems
    • Finance and payment systems
    • Line-of-business tools (e.g., warehouse, booking, manufacturing, practice management)
    • Email, file-sharing, and collaboration tools

For each, determine:

  • When must it be available? (e.g., 9–6 on weekdays, 24/7 for customer portals)
  • Can it be accessed remotely (e.g., via cloud, VPN, or web interface)?
  • What is the acceptable downtime window during the move?

This helps you prioritize what needs to be up first at the new office and supports strategies like temporary dual-running of old and new connections to minimize downtime.

4. Involve Key Stakeholders Early

An IT move touches many parts of the business. Bring together:

  • Internal IT or your managed IT services provider (MSP)
  • Senior management / operations
  • Department heads (sales, finance, operations, HR)
  • External IT partners or vendors (cloud providers, software vendors)
  • Telecoms and internet providers
  • The landlord and building management at both old and new sites

Clarify:

  • Move date(s) and any flexibility in timing
  • Business-critical periods to avoid (month-end, seasonal peaks)
  • Budget for upgrades and new services
  • Who has decision-making authority if trade-offs are needed

Phase 2: Design & Procurement

Once you know what you have and what the new space offers, you can design the future setup.

1. Design the New Network

Your network is the foundation of everything else.

  • LAN (Local Area Network):
    • Decide how many switches you need and where they will sit (usually in a central comms cabinet).
    • Plan separate “patching” for different groups (e.g., staff workstations, printers, IP phones).
  • Wi‑Fi coverage:
    • Use floor plans (and ideally a site survey) to place access points.
    • Aim for seamless coverage in working areas and meeting rooms.
    • Avoid relying on a single access point for the whole office; multiple APs with proper placement are more reliable.
  • Network segmentation (VLANs if applicable):
    • Even for SMEs, simple segmentation can improve security and performance:
      • Staff devices
      • Guest Wi‑Fi
      • Servers and network devices
      • Voice/phones
    • Your IT provider can configure this on your switches and firewall.
  • Internet edge and firewall:
    • Decide which firewall/router you’ll use at the new site.
    • Plan firewall rules, VPNs, and remote access in advance.
    • If you’re upgrading, consider this part of the move to improve security.

2. Plan Internet and Phone Lines (Mind the Lead Times)

Internet and phone services often have the longest lead times—sometimes 4–12 weeks for business-grade circuits.

Actions:

  • Order new internet lines as soon as the move date is known.
  • Confirm installation dates in writing and build in buffer time.
  • For VoIP:
    • Check whether your phone numbers can be easily moved or ported.
    • Confirm how phones will connect at the new site (physical handsets vs softphones on PCs/mobile).
  • Consider dual-running connections:
    • Keep internet live at the old office for a short period after go-live at the new site.
    • This provides a safety net and reduces the risk of complete outage if the new line has issues.

3. Decide What to Upgrade, Replace, or Retire

An office move is an ideal point to modernize and clean up your IT environment.

Consider:

  • Replacing out-of-warranty servers, switches, and firewalls with newer, more reliable models.
  • Upgrading aging PCs and laptops that are due for refresh.
  • Moving more services to the cloud to reduce dependence on on-site infrastructure.
  • Retiring unused applications or hardware (old servers, legacy phone systems, spare printers).

Balance cost with risk: it may be better to replace a failing 7‑year-old server before the move rather than risk it dying in transit.

4. Order New Equipment and Services

Based on your design:

  • Order:
    • Network switches, firewalls, access points
    • Racks and cabinets, patch panels, cables
    • UPS units and power distribution
    • Any new laptops, desktops, phones, or printers
  • Arrange:
    • Cloud service upgrades or license changes
    • Professional services from your IT partner to design, configure, and implement the new setup

Align delivery dates so equipment arrives at least 2–3 weeks before cutover. This gives time for configuration and testing.


Phase 3: Preparation & Testing

1. Create a Detailed IT Relocation Checklist and Timeline

Turn your plan into a clear, action-based checklist with owners and dates.

Include:

  • Milestones (internet live date, new rack installed, pre-staging date)
  • Dependencies (can’t install firewall until internet is live)
  • Who is responsible (internal IT, MSP, telecoms provider, movers)

This becomes your master plan for the move.

2. Backup and Verify Critical Data and Configurations

Before any hardware is shut down or moved:

  • Perform full backups of:
    • Servers (file servers, application servers, virtual machines)
    • Critical databases
    • Configuration backups for firewalls, switches, routers, and key applications
  • Store backups:
    • In at least one off-site or cloud location
    • Encrypted and protected with appropriate access control
  • Test restores:
    • Restore sample files or a test VM to ensure backups are working and data is usable.

Never rely on a single, untested backup before a major change like an office move.

3. Document Configurations and Access Details

Good documentation reduces mistakes and speeds up troubleshooting.

Document:

  • Network diagrams and IP addressing scheme (subnets, gateways, VLANs)
  • Device lists with:
    • Device name
    • Role (e.g., core switch, print server)
    • IP address
    • Location (old office rack, new office rack position)
  • Logins and access details:
    • Admin access for firewalls, switches, servers (stored securely, not in plain text)
    • Support contact details for key vendors and service providers

Keep a secure printed copy and a digital copy accessible to the move team.

4. Prepare User Communication Plans

Your staff need to know what to expect:

  • Before the move:
    • Which systems may be unavailable and when.
    • When to pack up IT equipment (laptops, docks, monitors, desk phones).
    • How to label equipment so it ends up at the right new desk.
  • During the move:
    • Who to contact if they urgently need access to a system.
    • Whether they should plan to work from home using cloud services and VPN.
  • After the move:
    • How to log IT issues (email, helpdesk portal, phone).
    • Any changes to Wi‑Fi names, passwords, phone extensions, or printing processes.

Clear communication reduces confusion and helps you maintain productivity, especially if you leverage cloud tools and remote working during the move.

5. Pre-Stage and Test at the New Site

Where possible, get as much done before move weekend:

  • Install racks, cabinets, and UPS in the server/comms room.
  • Mount and connect switches, patch panels, and access points.
  • Connect and configure the firewall and internet circuit.
  • Configure Wi‑Fi networks (staff and guest).
  • Set up VPN and test remote access.
  • If you have spare hardware, consider building a parallel environment to test key services.

Run tests:

  • Internet speed and reliability
  • Wi‑Fi coverage and performance (especially in meeting rooms and high-density areas)
  • VPN connectivity from remote locations
  • Test calls over VoIP and confirm call quality

Fixing issues now is far easier than on move day.


Phase 4: Move Weekend / Cutover

This is where planning pays off. Aim to do the bulk of the cutover outside core business hours (e.g., evenings or weekends) to minimize downtime.

1. Step-by-Step Checklist for Physical Move

Agree a plan with your IT team and movers:

  • Label all equipment clearly:
    • Device name, destination room, rack or desk location.
  • Use anti-static bubble wrap and proper packing for sensitive equipment (servers, switches, desktops).
  • Transport:
    • Keep critical equipment under supervision.
    • Minimize exposure to dust, vibration, and extreme temperatures.
  • Maintain chain of custody:
    • Especially for servers or devices containing sensitive data.
    • Record who is responsible for each device in transit.

2. Proper Shutdown Procedures

Never simply unplug servers or network devices.

  • For servers:
    • Notify users of planned downtime.
    • Gracefully shut down applications and services.
    • Perform controlled shutdowns via the operating system or hypervisor.
    • Turn off power after shutdown completes.
  • For network devices:
    • Power down firewalls, switches, and storage according to vendor guidance.
    • Disconnect cables carefully and keep them labeled.

3. Re-Rack and Reconnect at the New Site

At the new office:

  • Mount servers, switches, and firewalls in the pre-installed racks.
  • Reconnect patch cables following your documented plan (use labeled ports and cables).
  • Verify:
    • Power connections to UPS and power distribution units.
    • Network uplinks between switches and firewall/router.
    • Connections from switches to patch panels and out to desks.

Avoid “ad-hoc” cabling. Sticking to your plan reduces troubleshooting time and keeps the setup clean.

4. Bring Systems Online in Priority Order

Start with foundational services:

  1. Power and cooling: Confirm server room cooling and UPS are working.
  2. Internet and firewall: Bring up the firewall/router and confirm internet access.
  3. Internal network: Power on switches, confirm connectivity between VLANs where appropriate.
  4. Core services:
    • Domain controllers / authentication servers
    • File servers and application servers
    • VoIP system / phone controller
  5. User endpoints:
    • Desktops and laptops
    • Phones and headsets
    • Printers/MFPs

5. Validate Services and Applications

Run through a structured test plan:

  • Network and internet:
    • Test from multiple desks: can you reach the internet and internal servers?
    • Check DNS resolution (websites and internal names).
  • Key applications:
    • Log in to CRM, finance, line-of-business apps, and SaaS tools.
    • Test reading and writing data (e.g., creating a sample record).
  • File access:
    • Open, save, and search for files on shared drives or cloud storage.
    • Confirm permissions are intact.
  • VoIP/phones:
    • Test inbound and outbound calls.
    • Check hunt groups, ring groups, and call routing.
    • Test voicemail where applicable.
  • Printing and scanning:
    • Print from several workstations to each printer.
    • Test scan-to-email or scan-to-folder workflows.

6. Handle Issues: Escalation Path and Support Coverage

Even with great planning, issues may appear. Be ready:

  • Have your IT support team (internal or MSP) on-site or on standby for move weekend and the first working days.
  • Define escalation contacts:
    • Primary and secondary contacts at your ISP, VoIP provider, and key software vendors.
  • Track issues:
    • Use a simple log or ticketing system to record problems, owners, and resolutions.

Phase 5: Post-Move Validation & Optimization

The move doesn’t end when everyone’s seated at their new desks. The first days and weeks are critical.

1. Post-Move Testing Checklist

Beyond basic “does it work”, check:

  • Performance:
    • Are internet speeds as expected?
    • Are applications responsive, or is there noticeable lag?
  • Stability:
    • Any frequent disconnections from Wi‑Fi or VPN?
    • Are phones dropping calls?
  • Security:
    • Confirm firewall rules are correctly applied (no unexpected open access).
    • Ensure guest Wi‑Fi is isolated from internal systems.
    • Verify only authorized users can access shared drives and business systems.

2. Confirm Backups, Monitoring, and Security Tools

Ensure your protection layers are operating correctly:

  • Backups:
    • Confirm backup jobs are running on the new IP addresses/servers.
    • Review logs and run a test restore.
  • Monitoring:
    • Ensure any monitoring tools or services are tracking the new environment (servers, network devices, internet connectivity).
  • Security tools:
    • Confirm managed antivirus/EDR agents are active and up to date.
    • Check firewall and intrusion detection/prevention systems (if used).
    • Verify email security and spam filtering are working as before.

3. Collect User Feedback

Staff quickly reveal gaps in your plan:

  • Ask teams:
    • Are there any dead spots in Wi‑Fi coverage?
    • Are they experiencing issues with applications, printing, or phones?
    • Do they know how to connect to meeting room equipment?
  • Gather feedback via:
    • Short surveys
    • Team meetings
    • Your existing IT support channels

Prioritize fixes that affect many users or critical workflows.

4. Update Documentation and Asset Inventory

Finalize your records:

  • Update:
    • Network diagrams with final device locations and IPs
    • Asset inventory with new asset locations (desks, racks, rooms)
    • IT policies and procedures where needed (e.g., new Wi‑Fi details, updated remote access process)

Good documentation supports efficient ongoing managed IT services and future changes.


Risk Management & Security in an IT Relocation

1. Data Protection

  • Backups: Ensure you have recent, tested backups before the move.
  • Encryption: Where practical, encrypt data on laptops and portable drives.
  • Chain of custody: Keep a record of who is responsible for each device containing sensitive data during transit.

2. Physical Security at the New Site

  • Use a lockable server room or secure cabinet for network cores and servers.
  • Restrict access to authorized IT staff or trusted managers.
  • Ensure racks are bolted or secure and that cabling is not easily accessible in public areas.

3. Cybersecurity Considerations

  • Firewall rules: Review and adjust to reflect the new network layout and IP ranges.
  • Access control: Confirm user accounts and permissions align with least-privilege principles.
  • Wi‑Fi security:
    • Use strong encryption (e.g., WPA2/WPA3) and robust passwords.
    • Separate guest Wi‑Fi from internal networks.
  • Remote access: Validate VPN and remote access tools are secure, using strong authentication and up-to-date software.

Strategies to Minimize Downtime During an Office Move

Throughout all phases, keep downtime reduction front and center:

  • Plan cutovers outside business hours (evenings/weekends).
  • Use dual-running where possible:
    • Keep old office internet and phones live for a short overlap period.
  • Leverage cloud services and VPN:
    • Allow staff to work from home or the old office while the new site is finalized.
  • Prioritize critical systems:
    • Bring up and test CRM, email, and line-of-business apps first.
  • Communicate clearly:
    • Let staff and key customers know about planned maintenance windows and what to expect.

Consolidated IT Relocation Checklist (Before / During / After)

BEFORE THE MOVE (8–12 Weeks and Leading Up to Cutover)

Assessment & Planning

  • Compile a full inventory of IT hardware, software, and circuits.
  • Identify business-critical applications and acceptable downtime windows.
  • Visit the new office to assess power, cabling, comms room, and internet options.
  • Confirm move date and any blackout periods with management and key departments.
  • Engage IT partners, telecoms providers, and landlords/building management.

Design & Procurement

  • Design the new network (LAN, Wi‑Fi, VLANs if appropriate).
  • Choose firewall/router, switches, wireless access points, and UPS units.
  • Confirm available internet options and order new circuits immediately.
  • Confirm VoIP/phone migration plan, including number porting and call routing.
  • Decide what to upgrade, replace, or retire as part of the move.
  • Order all required hardware, licenses, and services with at least 2–3 weeks’ buffer.

Preparation & Testing

  • Create a detailed IT relocation project plan with responsibilities and dates.
  • Perform full backups of critical servers, applications, and data.
  • Verify backups by restoring test files/VMs.
  • Document network configuration, IP schemes, device lists, and admin access (securely).
  • Prepare user communications (before/during/after move).
  • Pre-stage network kit at the new office: install racks, switches, firewall, access points.
  • Configure and test:
    • New internet circuit(s)
    • Wi‑Fi networks (staff and guest)
    • VPN and remote access
    • Test VoIP calls over the new connection

DURING THE MOVE (Move Weekend / Cutover)

Shutdown and Transport

  • Notify users before shutting down any systems.
  • Gracefully shut down servers, storage, and critical services.
  • Power down firewalls, switches, and network devices following vendor guidance.
  • Label all devices and cables with destination locations.
  • Pack IT equipment securely with anti-static protection.
  • Maintain a chain-of-custody record for sensitive devices in transit.

Reinstallation and Power-Up

  • Install servers, switches, firewall, and UPS in the new server/comms room.
  • Patch network ports according to your documented plan.
  • Power on and verify:
    • UPS and cooling systems
    • Internet connectivity via firewall/router
    • Switch interconnections and VLANs where applicable

Service Validation

  • Confirm staff devices can:
    • Connect to the internal network and internet
    • Access shared drives or cloud storage
    • Log into key SaaS tools (email, CRM, collaboration)
  • Test core business applications (create/edit records, run reports).
  • Test VoIP phones:
    • Make internal and external calls
    • Check ring groups and queues
  • Test printing and scanning from multiple workstations.
  • Log and escalate any critical issues immediately to your IT provider or vendor.

AFTER THE MOVE (First Week and Beyond)

Post-Move Testing & Stabilization

  • Confirm internet speed and stability match expectations.
  • Verify Wi‑Fi coverage in all critical areas; adjust access point placement if needed.
  • Check that VPN and remote access work reliably for remote staff.
  • Confirm firewall rules, guest Wi‑Fi isolation, and access controls are correct.

Backups, Monitoring, and Security

  • Confirm backups are running successfully in the new environment.
  • Perform a test restore of key data.
  • Check monitoring tools are alerting correctly on servers, network devices, and internet links.
  • Verify security tools (managed antivirus/EDR, email security) are active and updating.

User Feedback and Optimization

  • Ask staff for feedback on:
    • Wi‑Fi, printing, application performance, and phone usability.
  • Log all reported issues and track them through to resolution.
  • Fine-tune Wi‑Fi, QoS (if used for VoIP), and workstation setups based on real-world use.

Documentation and Handover

  • Update network diagrams, IP address plans, and device locations.
  • Update asset inventory with current equipment, serial numbers, and new locations.
  • Review and adjust IT policies and user guides to match the new setup.
  • Agree ongoing support and maintenance arrangements with your IT provider.

Relocating your office doesn’t have to mean major disruption. With structured planning, clear responsibilities, and a phase-by-phase checklist, SMEs can move their technology with minimal downtime—often emerging with a cleaner, more secure, and more efficient IT environment.

If your team is stretched or lacks in-house expertise, partnering with a managed IT services provider that offers comprehensive IT support, proactive monitoring, cybersecurity, cloud administration, and strategic guidance can make the entire process smoother and less risky